January 30, 2011

October, November & December brought record amounts of rain and we found some roof leaks that went from small nuisance to serious problems. The sunroom was leaking from the roof pitch meets the wall. So 2 weeks ago dana and I made a trip to HD and picked up the asphalt soaked fiberglass mesh and plasticized roof patching compound. 

Dana donned the tyvek suit with me and we comensed patching. We assembly lined it and got a solid patch along the entire seam and any small cracks.

After some light rains today no water is coming through and think we should be good until we actually replace the roofing.

 
Comments
blog comments powered by Disqus